Day 1 - Excavation 11-18-11





Day 2 - Steel and Plumbing 11-21-11



Day 3 - City Inspection 11-22-11
Day 4 - Gunite 11-23-11

Steam off the freshly poured gunite.

Leaves already in the pool. This should prove interesting every fall.

At this point, we are watering the gunite shell twice a day for 5 days. This is to make sure the mixture doesn't dry to quickly. We got a nice rain storm last night that helped me get out of watering this morning.
Now that the pool shell is in, we can really envision the size and depth, and we think it is just perfect for Caleigh. The first week has been a lot of fun. We've never seen a pool being built before. It's an interesting process so far and everyone has been super fast. We go outside with Caleigh and talk about what was done that day. Caleigh smiles like crazy. It's beautiful to see her so excited.





Day 2 - Steel and Plumbing 11-21-11



Day 3 - City Inspection 11-22-11
Day 4 - Gunite 11-23-11

Steam off the freshly poured gunite.

Leaves already in the pool. This should prove interesting every fall.

At this point, we are watering the gunite shell twice a day for 5 days. This is to make sure the mixture doesn't dry to quickly. We got a nice rain storm last night that helped me get out of watering this morning.
Now that the pool shell is in, we can really envision the size and depth, and we think it is just perfect for Caleigh. The first week has been a lot of fun. We've never seen a pool being built before. It's an interesting process so far and everyone has been super fast. We go outside with Caleigh and talk about what was done that day. Caleigh smiles like crazy. It's beautiful to see her so excited.

1 comment:
Oh! Is that a beach entry???? That's going to be wonderful!
Post a Comment